Difference between revisions of "S1 Operations - AAR Life Cycle"
Richards.D (talk | contribs) |
Richards.D (talk | contribs) |
||
Line 8: | Line 8: | ||
|pointofcontact = S1 Officer in Charge | |pointofcontact = S1 Officer in Charge | ||
}} | }} | ||
+ | |||
+ | =Introduction= | ||
+ | This policy will detail the process to process Operational AARs in the MILPACS System. | ||
+ | |||
+ | =Life Cycle Process= | ||
+ | This section will detail how to process an AAR. | ||
+ | |||
+ | ==Step 1== | ||
+ | Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”. | ||
+ | |||
+ | Image 1. | ||
+ | |||
+ | ==Step 2== | ||
+ | Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column. | ||
+ | |||
+ | ==Step 3== | ||
+ | Add the AAR link into the H column, date of the mission into the F column and the AO into the G column. | ||
+ | |||
+ | ==Step 4== | ||
+ | Bark “awaiting thread lock in the A column. Examples: | ||
+ | |||
+ | Image 2. | ||
+ | |||
+ | ==Step 5== | ||
+ | Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list. | ||
+ | |||
+ | ==Step 6== | ||
+ | Lock the AAR thread. | ||
+ | |||
+ | Image 4. | ||
+ | |||
+ | ==Step 7== | ||
+ | Comment “LOCKED” on the AAR post. | ||
+ | |||
+ | ==Step 8== | ||
+ | Mark column “A” as Awaiting MILPACS. | ||
+ | |||
+ | Image 5. | ||
+ | |||
+ | ==Step 9== | ||
+ | Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”. | ||
+ | |||
+ | Image 6. | ||
+ | |||
+ | ==Step 10== | ||
+ | Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L. | ||
+ | |||
+ | Image 7. |
Revision as of 23:47, 21 March 2021
This is the Document Release Information | |
Article Number: | 7CAV-DR-006 |
Scope: | S1 Operations - Life Cycle of an After action report |
Version: | Version 1.0 |
Effective Date: | 21MAR21 |
Last Modified Date: | 21MAR21 |
Approving Authority: | S1 Officer in Charge |
Point of Contact: | S1 Officer in Charge |
Introduction
This policy will detail the process to process Operational AARs in the MILPACS System.
Life Cycle Process
This section will detail how to process an AAR.
Step 1
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.
Image 1.
Step 2
Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column.
Step 3
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.
Step 4
Bark “awaiting thread lock in the A column. Examples:
Image 2.
Step 5
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list.
Step 6
Lock the AAR thread.
Image 4.
Step 7
Comment “LOCKED” on the AAR post.
Step 8
Mark column “A” as Awaiting MILPACS.
Image 5.
Step 9
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.
Image 6.
Step 10
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.
Image 7.