Introduction
This policy will detail the process to process Operational AARs in the MILPACS System.
Life Cycle Process
This section will detail how to process an AAR.
Step 1
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.
Image 1.
Step 2
Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column.
Step 3
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.
Step 4
Bark “awaiting thread lock in the A column. Examples:
Image 2.
Step 5
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list.
Step 6
Lock the AAR thread.
Image 4.
Step 7
Comment “LOCKED” on the AAR post.
Step 8
Mark column “A” as Awaiting MILPACS.
Image 5.
Step 9
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.
Image 6.
Step 10
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.
Image 7.
The L column should be displayed like this:
- 0
Ensure that you type the name of the Operation in the same way it’s typed on the “Operations” tab or you will get an Error
Step 11
Move to the “Rank Remover Utility” CTRL+C from the AAR post’s master list, then CTRL+SHIFT+V into row 4 column B
Image 8.