This policy will detail the process to process Operational AARs in the MILPACS System. | |||
=Life Cycle Process= | |||
This section will detail how to process an AAR. | |||
==Step 1== | |||
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”. | |||
Image 1. | |||
==Step 2== | |||
Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column. | |||
==Step 3== | |||
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column. | |||
==Step 4== | |||
Bark “awaiting thread lock in the A column. Examples: | |||
Image 2. | |||
==Step 5== | |||
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list. | |||
==Step 6== | |||
Lock the AAR thread. | |||
Image 4. | |||
==Step 7== | |||
Comment “LOCKED” on the AAR post. | |||
==Step 8== | |||
Mark column “A” as Awaiting MILPACS. | |||
Image 5. | |||
==Step 9== | |||
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”. | |||
Image 6. | |||
==Step 10== | |||
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L. | |||
Image 7. |
Revision as of 23:47, 21 March 2021
This is the Document Release Information | |
Article Number: | 7CAV-DR-006 |
Scope: | S1 Operations - Life Cycle of an After action report |
Version: | Version 1.0 |
Effective Date: | 21MAR21 |
Last Modified Date: | 21MAR21 |
Approving Authority: | S1 Officer in Charge |
Point of Contact: | S1 Officer in Charge |
Introduction
This policy will detail the process to process Operational AARs in the MILPACS System.
Life Cycle Process
This section will detail how to process an AAR.
Step 1
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.
Image 1.
Step 2
Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column.
Step 3
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.
Step 4
Bark “awaiting thread lock in the A column. Examples:
Image 2.
Step 5
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list.
Step 6
Lock the AAR thread.
Image 4.
Step 7
Comment “LOCKED” on the AAR post.
Step 8
Mark column “A” as Awaiting MILPACS.
Image 5.
Step 9
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.
Image 6.
Step 10
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.
Image 7.