S1 Operations - AAR Life Cycle: Difference between revisions

From 7th Cavalry Wiki
Jump to navigation Jump to search
Richards.D (talk | contribs)
No edit summary
No edit summary
 
(7 intermediate revisions by one other user not shown)
Line 19: Line 19:
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.
Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.


Image 1.
[[File:AAR_LifeCycle_1.png|AAR_LifeCycle_1.png]]


==Step 2==
==Step 2==
Line 26: Line 26:
==Step 3==
==Step 3==
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.
Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.
[[File:S1operationsaar2.png|AAR_LifeCycle_1.png]]


==Step 4==
==Step 4==
Bark “awaiting thread lock in the A column. Examples:
Bark “awaiting thread lock in the A column. Examples:


Image 2.
[[File:S1operationsaar3.png|AAR_LifeCycle_1.png]]


==Step 5==
==Step 5==
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the OIC has enough time to update the master list.
Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the 1IC has enough time to update the master list.


==Step 6==
==Step 6==
Lock the AAR thread.
Lock the AAR thread.


Image 4.
[[File:S1operationsaar4.png|AAR_LifeCycle_1.png]]


==Step 7==
==Step 7==
Comment “LOCKED” on the AAR post.
Comment “LOCKED” on the AAR post.
[[File:S1operationsaar5.png|AAR_LifeCycle_1.png]]


==Step 8==
==Step 8==
Mark column “A” as Awaiting MILPACS.
Mark column “A” as Awaiting MILPACS.


Image 5.
[[File:S1operationsaar6.png|AAR_LifeCycle_1.png]]


==Step 9==
==Step 9==
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.
Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.


Image 6.
[[File:S1operationsaar7.png|AAR_LifeCycle_1.png]]


==Step 10==
==Step 10==
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.
Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.


Image 7.
[[File:S1operationsaar8.png|AAR_LifeCycle_1.png]]


The L column should be displayed like this:
The L column should be displayed like this:
Line 65: Line 69:
Move to the “Rank Remover Utility” CTRL+C from the AAR post’s master list, then CTRL+SHIFT+V into row 4 column B
Move to the “Rank Remover Utility” CTRL+C from the AAR post’s master list, then CTRL+SHIFT+V into row 4 column B


Image 8.
[[File:S1operationsaar9.png|AAR_LifeCycle_1.png]]


* If it shows “format” in the H column, it means the rank is incorrect, the trooper could have been promoted/demoted since then, so try the rank above, if it still shows format, check their MILPACS to see their rank.
* If it shows “format” in the H column, it means the rank is incorrect, the trooper could have been promoted/demoted since then, so try the rank above, if it still shows format, check their MILPACS to see their rank.


Images 9, 10.
[[File:AAR_LifeCycle_9.png|AAR_LifeCycle_1.png]] </br>
[[File:AAR_LifeCycle_10.png|AAR_LifeCycle_1.png]]


==Step 12==
==Step 12==
Line 77: Line 82:
Transfer the troopers to the Operation builder, there’s a button in the top left of the screen, but sometimes it is not visible:
Transfer the troopers to the Operation builder, there’s a button in the top left of the screen, but sometimes it is not visible:


Image 11.
[[File:S1operationsaar10.png|AAR_LifeCycle_1.png]]


Image 12.
[[File:S1operationsaar11.png|AAR_LifeCycle_1.png]]


* If you left click here it will run the script and this will display at the top of your screen:
* If you left click here it will run the script and this will display at the top of your screen:


Image 13.
[[File:S1operationsaar12.png|AAR_LifeCycle_1.png]]


* This will appear in the bottom right once the script has finished:
* This will appear in the bottom right once the script has finished:


Image 14.
[[File:S1operationsaar13.png|AAR_LifeCycle_1.png]]


==Step 14==
==Step 14==
Move to the Operations builder, and make sure all boxes are green:
Move to the Operations builder, and make sure all boxes are green:


Image 15.
[[File:S1operationsaar14.png|AAR_LifeCycle_1.png]]


# Check 1: If Check #1 fails that means that the trooper has been entered multiple times on this list. >>Delete<< the rows that are multiples. DO NOT LEAVE ANY GAPS BETWEEN TROOPERS ROWS.
# Check 1: If Check #1 fails that means that the trooper has been entered multiple times on this list. >>Delete<< the rows that are multiples. DO NOT LEAVE ANY GAPS BETWEEN TROOPERS ROWS.
Line 100: Line 105:
# Check 3: If Check #3 fails the trooper needs to be added to the 'Troopers' sheet before running the script.
# Check 3: If Check #3 fails the trooper needs to be added to the 'Troopers' sheet before running the script.


Image 16.
[[File:S1operationsaar15.png|AAR_LifeCycle_1.png]]


===How to Add a Trooper===
===How to Add a Trooper===
Line 107: Line 112:
* Insert a new row where they must go:
* Insert a new row where they must go:


Image 17.
[[File:S1operationsaar16.png|AAR_LifeCycle_1.png]]


* Insert their name into column C, check their MILPACS, if they have any previous Operations attended add the number of Operations into the D column, if they haven't attended any just put ”0”.
* Insert their name into column C, check their MILPACS, if they have any previous Operations attended add the number of Operations into the D column, if they haven't attended any just put ”0”.
Line 113: Line 118:
* In the “G,H,I and J” column write “0” and ensure all of them are not colored.
* In the “G,H,I and J” column write “0” and ensure all of them are not colored.


Image 18.
[[File:S1operationsaar17.png|AAR_LifeCycle_1.png]]


* If the person has been awarded a service ribbon in the past, colour one of the sections green relative to the medal they have been awarded.
* If the person has been awarded a service ribbon in the past, colour one of the sections green relative to the medal they have been awarded.


Image 19.
[[File:S1operationsaar18.png|AAR_LifeCycle_1.png]]


==Step 15==
==Step 15==
Once all checks are green, select the Operation you are processing from the drop down menu and press the button at the top(this can also appear as invisible but it is located here:
Once all checks are green, select the Operation you are processing from the drop down menu and press the button at the top(this can also appear as invisible but it is located here:


 
[[File:S1operationsaar19.png|AAR_LifeCycle_1.png]]
Images 20 and 21.
[[File:S1operationsaar20.png|AAR_LifeCycle_1.png]]


==Step 16==
==Step 16==
Check that troopers were added to the sheet:
Check that troopers were added to the sheet:


Image 22.
[[File:S1operationsaar21.png|AAR_LifeCycle_1.png]]
 
* To do this, move to the “Troopers” tab and check that it says “MILPACS” in the L column in at least one row.
 
[[File:S1operationsaar22.png|AAR_LifeCycle_1.png]]
 
==Step 17==
Move to the “MILPACS Helper” tab and select the Operation you are processing at the Top.
 
[[File:S1operationsaar23.png|AAR_LifeCycle_1.png]]
 
 
==Step 18==
Add the Op to MILPACS.
* Copy the verbage
* Press the right hand link of that row
* Paste the verbage
* Change the Roster type to “Operation”
* Change the Record date to the date of the OP
* Press save
 
[[File:S1operationsaar24.png|AAR_LifeCycle_1.png]]
 
==Step 19==
Once all the troopers are complete, go to the “Troopers tab” in the top where it says “S1 Tools” go to “MILPACS>complete” then “Complete L column”:
 
[[File:S1operationsaar25.png|AAR_LifeCycle_1.png]]
 
==Step 20==
Go to the “Operations” tab and change the status to “Complete”:
 
[[File:S1operationsaar26.png|AAR_LifeCycle_1.png]]
 
==Step 21==
Ensure the troops tab is displaying Operation attendance:
 
[[File:S1operationsaar27.png|AAR_LifeCycle_1.png]]
 
==Step 22==
Comment on the AAR post “S1 Operations Updated”.
 
[[File:S1operationsaar28.png|AAR_LifeCycle_1.png]]
 
==Step 23==
Add your name into the “processed by” column on the Operations tab. You have successfully processed an operation.

Latest revision as of 12:23, 18 June 2023

This is the Document Release Information
Article Number: 7CAV-DR-006
Scope: S1 Operations - Life Cycle of an After action report
Version: Version 1.0
Effective Date: 21MAR21
Last Modified Date: 21MAR21
Approving Authority: S1 Officer in Charge
Point of Contact: S1 Officer in Charge


Introduction

This policy will detail the process to process Operational AARs in the MILPACS System.

Life Cycle Process

This section will detail how to process an AAR.

Step 1

Once an AAR is posted, the first step is to add it to the “Operations” tab. Right click on Row 3 and press “insert 1 above”.

AAR_LifeCycle_1.png

Step 2

Next type the campaign name(if applicable) and Operation name into the C and D column respectively. It is key to note: do not write “Operation” or “campaign” in the C or D column.

Step 3

Add the AAR link into the H column, date of the mission into the F column and the AO into the G column.

AAR_LifeCycle_1.png

Step 4

Bark “awaiting thread lock in the A column. Examples:

AAR_LifeCycle_1.png

Step 5

Once 7 days has passed since the Operation was ran, column E will turn green, this means it’s ready to process, we wait 7 days so that the 1IC has enough time to update the master list.

Step 6

Lock the AAR thread.

AAR_LifeCycle_1.png

Step 7

Comment “LOCKED” on the AAR post.

AAR_LifeCycle_1.png

Step 8

Mark column “A” as Awaiting MILPACS.

AAR_LifeCycle_1.png

Step 9

Move to the “Troopers” tab, right click on the “L” column and select “Insert 1 left”.

AAR_LifeCycle_1.png

Step 10

Type the Operation name in row 1, column L and copy/paste the formula from row 4 column M into Row 4 Column L.

AAR_LifeCycle_1.png

The L column should be displayed like this:

  • 0

Ensure that you type the name of the Operation in the same way it’s typed on the “Operations” tab or you will get an Error

Step 11

Move to the “Rank Remover Utility” CTRL+C from the AAR post’s master list, then CTRL+SHIFT+V into row 4 column B

AAR_LifeCycle_1.png

  • If it shows “format” in the H column, it means the rank is incorrect, the trooper could have been promoted/demoted since then, so try the rank above, if it still shows format, check their MILPACS to see their rank.

AAR_LifeCycle_1.png
AAR_LifeCycle_1.png

Step 12

Ensure that none of the names say “FORMAT” in the H column

Step 13

Transfer the troopers to the Operation builder, there’s a button in the top left of the screen, but sometimes it is not visible:

AAR_LifeCycle_1.png

AAR_LifeCycle_1.png

  • If you left click here it will run the script and this will display at the top of your screen:

AAR_LifeCycle_1.png

  • This will appear in the bottom right once the script has finished:

AAR_LifeCycle_1.png

Step 14

Move to the Operations builder, and make sure all boxes are green:

AAR_LifeCycle_1.png

  1. Check 1: If Check #1 fails that means that the trooper has been entered multiple times on this list. >>Delete<< the rows that are multiples. DO NOT LEAVE ANY GAPS BETWEEN TROOPERS ROWS.
  1. Check 2: If Check #2 fails then the trooper's name was not found in MILPACS. Check for correct spelling.
  1. Check 3: If Check #3 fails the trooper needs to be added to the 'Troopers' sheet before running the script.

AAR_LifeCycle_1.png

How to Add a Trooper

  • Move to the “Troopers” tab
  • Locate the alphabetical position (firstname) that the new trooper must go
  • Insert a new row where they must go:

AAR_LifeCycle_1.png

  • Insert their name into column C, check their MILPACS, if they have any previous Operations attended add the number of Operations into the D column, if they haven't attended any just put ”0”.
  • Drag the formula from the E and F column down into the boxes.
  • In the “G,H,I and J” column write “0” and ensure all of them are not colored.

AAR_LifeCycle_1.png

  • If the person has been awarded a service ribbon in the past, colour one of the sections green relative to the medal they have been awarded.

AAR_LifeCycle_1.png

Step 15

Once all checks are green, select the Operation you are processing from the drop down menu and press the button at the top(this can also appear as invisible but it is located here:

AAR_LifeCycle_1.png AAR_LifeCycle_1.png

Step 16

Check that troopers were added to the sheet:

AAR_LifeCycle_1.png

  • To do this, move to the “Troopers” tab and check that it says “MILPACS” in the L column in at least one row.

AAR_LifeCycle_1.png

Step 17

Move to the “MILPACS Helper” tab and select the Operation you are processing at the Top.

AAR_LifeCycle_1.png


Step 18

Add the Op to MILPACS.

  • Copy the verbage
  • Press the right hand link of that row
  • Paste the verbage
  • Change the Roster type to “Operation”
  • Change the Record date to the date of the OP
  • Press save

AAR_LifeCycle_1.png

Step 19

Once all the troopers are complete, go to the “Troopers tab” in the top where it says “S1 Tools” go to “MILPACS>complete” then “Complete L column”:

AAR_LifeCycle_1.png

Step 20

Go to the “Operations” tab and change the status to “Complete”:

AAR_LifeCycle_1.png

Step 21

Ensure the troops tab is displaying Operation attendance:

AAR_LifeCycle_1.png

Step 22

Comment on the AAR post “S1 Operations Updated”.

AAR_LifeCycle_1.png

Step 23

Add your name into the “processed by” column on the Operations tab. You have successfully processed an operation.